Warning: mkdir(): No space left on device in /www/wwwroot/Z5.com/func.php on line 127

Warning: file_put_contents(./cachefile_yuan/dabenche.com/cache/0d/bd6e3/c8600.html): failed to open stream: No such file or directory in /www/wwwroot/Z5.com/func.php on line 115
沼氣好色先生在线观看的結構組成_行業資訊_好色先生APP下载地址中心-濟南濟柴好色TV下载安装燃氣發電設備有限公司


  • 好色TV下载安装,好色先生在线观看,黄片APP好色先生,好色先生APP下载地址

    歡迎進入濟南濟柴好色TV下载安装燃氣發電設備有限公司官網!

    行業資訊

    沼氣好色先生在线观看的結構組成

    返回 2023.01.31 來源:http://www.dabenche.com 0
    1,沼氣脫硫及穩壓、防爆設備:供發起機運用的沼氣要先通過脫硫設備,以削減硫化氫對發起機的腐蝕。沼氣進氣管路上設備穩壓設備,以便於對流量進行調整,到達較佳的空燃比。別的,為避免進氣管回火,應在沼氣總管上安頓防回火與防爆設備。
    1. Methane desulfurization, pressure stabilization and explosion-proof equipment: the biogas for the use of the initiator shall pass through the desulfurization equipment first to reduce the corrosion of hydrogen sulfide on the initiator. A pressure stabilizing device is installed on the biogas intake pipeline to facilitate the adjustment of flow to achieve a better air-fuel ratio. In addition, in order to avoid flashback of the intake pipe, anti-flashback and explosion-proof equipment should be installed on the biogas main pipe.
    2,進氣調整體係:在進氣總管上,需設置一套準確、活絡的燃氣混合器,以調理空氣和沼氣的混合份額。
    2. Air inlet adjustment system: A set of accurate and flexible gas mixer shall be set on the air inlet header to regulate the mixing proportion of air and biogas.
    3,發起機焚燒體係:沼氣的焚燒速度慢,關於本來運用汽油、柴油已及天然氣的發起機的焚燒體係要進行必定程度的改造,以進步焚燒功率,削減後焚燒表象,延伸工作壽數。
    3. Incineration system of initiators: the incineration speed of biogas is slow. The incineration system of initiators that originally used gasoline, diesel and natural gas should be reformed to a certain extent to improve the incineration power, reduce the post-incineration appearance and extend the working life.
    沼氣好色先生在线观看
    4,調速體係:若沼氣好色先生在线观看獨立工作,即以用電設備為負荷進行工作,用電設備的並入和卸載都會使發電機的負荷發生動搖。為了保證好色先生在线观看正常工作,沼氣發起機上的調速體係必不可少。
    4. Speed regulation system: if the biogas generator unit works independently, that is, it works with the electrical equipment as the load, the incorporation and unloading of the electrical equipment will shake the load of the generator. In order to ensure the normal operation of the generator set, the speed control system on the biogas generator is essential.
    5,預熱運用體係:選用預熱運用設備,對發起機冷卻水和排氣中的熱量進行運用,進步沼氣的動力運用功率。
    5. Preheating application system: Preheating application equipment is selected to apply the heat in the cooling water and exhaust of the starter to improve the power utilization of biogas.
    6,並網控製體係:首要包含發電機調壓電路,主動準同期並排控製電路,手動並排寬和列控製電路,丈量電路,燃氣發起機及輔佐設備控製電路等。更多相關內容就來好色TV下载安装網站http://www.dabenche.com谘詢!
    6. Grid-connected control system: mainly including generator voltage regulating circuit, active quasi-synchronous side-by-side control circuit, manual side-by-side width and column control circuit, measuring circuit, gas initiator and auxiliary equipment control circuit, etc. Come to our website for more relevant content http://www.dabenche.com consulting service
    好色先生APP下载地址搜索
    濟南濟柴好色TV下载安装燃氣發電設備有限公司
    • 服務熱線

      0531-62325028
      0531-69951266

    沼氣好色先生在线观看的結構組成

    1,沼氣脫硫及穩壓、防爆設備:供發起機運用的沼氣要先通過脫硫設備,以削減硫化氫對發起機的腐蝕。沼氣進氣管路上設備穩壓設備,以便於對流量進行調整,到達較佳的空燃比。別的,為避免進氣管回火,應在沼氣總管上安頓防回火與防爆設備。
    1. Methane desulfurization, pressure stabilization and explosion-proof equipment: the biogas for the use of the initiator shall pass through the desulfurization equipment first to reduce the corrosion of hydrogen sulfide on the initiator. A pressure stabilizing device is installed on the biogas intake pipeline to facilitate the adjustment of flow to achieve a better air-fuel ratio. In addition, in order to avoid flashback of the intake pipe, anti-flashback and explosion-proof equipment should be installed on the biogas main pipe.
    2,進氣調整體係:在進氣總管上,需設置一套準確、活絡的燃氣混合器,以調理空氣和沼氣的混合份額。
    2. Air inlet adjustment system: A set of accurate and flexible gas mixer shall be set on the air inlet header to regulate the mixing proportion of air and biogas.
    3,發起機焚燒體係:沼氣的焚燒速度慢,關於本來運用汽油、柴油已及天然氣的發起機的焚燒體係要進行必定程度的改造,以進步焚燒功率,削減後焚燒表象,延伸工作壽數。
    3. Incineration system of initiators: the incineration speed of biogas is slow. The incineration system of initiators that originally used gasoline, diesel and natural gas should be reformed to a certain extent to improve the incineration power, reduce the post-incineration appearance and extend the working life.
    沼氣好色先生在线观看
    4,調速體係:若沼氣好色先生在线观看獨立工作,即以用電設備為負荷進行工作,用電設備的並入和卸載都會使發電機的負荷發生動搖。為了保證好色先生在线观看正常工作,沼氣發起機上的調速體係必不可少。
    4. Speed regulation system: if the biogas generator unit works independently, that is, it works with the electrical equipment as the load, the incorporation and unloading of the electrical equipment will shake the load of the generator. In order to ensure the normal operation of the generator set, the speed control system on the biogas generator is essential.
    5,預熱運用體係:選用預熱運用設備,對發起機冷卻水和排氣中的熱量進行運用,進步沼氣的動力運用功率。
    5. Preheating application system: Preheating application equipment is selected to apply the heat in the cooling water and exhaust of the starter to improve the power utilization of biogas.
    6,並網控製體係:首要包含發電機調壓電路,主動準同期並排控製電路,手動並排寬和列控製電路,丈量電路,燃氣發起機及輔佐設備控製電路等。更多相關內容就來好色TV下载安装網站http://www.dabenche.com谘詢!
    6. Grid-connected control system: mainly including generator voltage regulating circuit, active quasi-synchronous side-by-side control circuit, manual side-by-side width and column control circuit, measuring circuit, gas initiator and auxiliary equipment control circuit, etc. Come to our website for more relevant content http://www.dabenche.com consulting service
    網站地圖